The boat was loaded on an open, flat rack container and the derricks and spares were stuffed in a 20 ft open top container. Partners in this move were our industrial packers who also took care of collection of the cargo from various loading locations and of stuffing and transporting the containers.
Client was very positive on how we handled the move and was happy with the pricing offered.